![]() Cessna Citation Maintenance Complex |
|
Establishing the bold curvilinear design, EMCO employed
matched Horizontal Curved Panels |
|
Completed in May of 1997, this facility represents the latest advances in a full-service flight maintenance facility. The latest in Cessna's new advance design concept, both the hangar and the customer service center are fully air conditioned. |
|
|
In its present form, the insulated wall system is primarily comprised of vertical, 2" deep factory insulated wall panel. Accenting both the deep-profiled Horizontal panel and the vertical insulated panel are 12" wide F-12 fascia and soffit panels. |
It is particularly noteworthy that initial design for the exterior metal system was based around a traditional, field-insulated wall system. EMCO's proposals for the project offered an alternate, cost savings proposal based upon conversion to a factory insulated wall system.

Owner: Cessna Aircraft Company
Architect: Rossi & Associates
Contractor: The Engineered Metals Company Construction
Products: Wall = AW-220 R=17 Insulated Wall Panel
Horizontal Panels = O-24
Soffit & Fascia = L-12
Projects |
Search |
Send mail to CompanyWebmaster with
questions or comments about this web site.
Copyright © 1997 The Engineered Metals Company. All rights reserved.
Last modified: September 14, 2000